New Orleans, LA


Working the horn into position. With no gin pole and derrick arm, the lift sheave was fixed in place under the main platform. So the only option was to use come-alongs to maneuver the antenna around. I remember hearing a lot of ratcheting sounds, but I had no telephoto and couldn't capture the work. It was now late in the afternoon. The dual side platform facing west is offset to the left - the same as the dual side platform at Stephentown.

Courtesy of Wayne Weishan