Dundee, MS


Courtesy of Wayne Weishan

The original, 2x4 TD2 hatchplate enters the building at the equipment floor-level. The second TD2 hatchplate enters the addition at same level, to the right. The top of the waveguide support bridge is even with top of tower base section, 25 feet above tower base plates, giving some idea of building's height.

The hatch-plates are at floor level on both routes with ground-level waveguide supports: a series of stanchions joined together by cover-plate. The TH 1x8 hatchplate is near roof level, probably because the WR159 waveguide entered the TH equipment bays through the top of cabinets, with some channel filters in the runs above the bay line-up.

The actual equipment floor level may be judged by engine-room door threshhold. Note the ladder (whose rungs are 1" galvanized rebar) to provide access from a boat.

Return to...

Created on January 8, 2006 at 16:43 by Albert LaFrance